Practice MCQ Questions and Answer on Time and Work
201.
A and B can do a piece of work in 25 days. B alone can do
- (A) 15
- (B) 20
- (C) 18
- (D) 12
202.
There was a leakage in the container of the refined oil. If 11 kg oil is leaked out per day then it would have lasted for 50 days, if the leakage was 15 kg per day, then it would have lasted for only 45 days. For how many days would the oil have lasted, if there was no leakage ant it was completely used for eating purpose?
- (A) 80 days
- (B) 72 days
- (C) 100 days
- (D) 120 days
203.
A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work?
- (A) 18 days
- (B) 24 days
- (C) 30 days
- (D) 36 days
204.
A can do
- (A)
- (B)
- (C)
- (D) 10 days
205.
If there is a reduction in the number of workers in a factory in the ratio 15 : 11 and an increment in their wages in the rate 22 : 25, then the ratio by which the total wages of the workers should be decreased is = ?
- (A) 6 : 5
- (B) 5 : 6
- (C) 3 : 7
- (D) 3 : 5
206.
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:
- (A) 4 days
- (B) 5 days
- (C) 6 days
- (D) 7 days
207.
A can do a piece of work in 4 hours, B and C together in 3 hours, and A and C together in 2 hours. How long will B alone take to do it ?
- (A) 8 hours
- (B) 10 hours
- (C) 12 hours
- (D) 24 hours
208.
A alone can do
- (A)
- (B)
- (C)
- (D)
209.
Two pipes A and B can fill a tank in 36 min. and 45 min. respectively. Another pipe C can empty the tank in 30 min. First A and B are opened. After 7 minutes, C is also opened. The tank filled up in:
- (A) 39 min.
- (B) 46 min
- (C) 40 min.
- (D) 45 min.
210.
A job can be complete by 12 men in 12 days. How many extra days will be needed to complete the job if 6 men leave after working for 6 days ?
- (A) 3 days
- (B) 6 days
- (C) 12 days
- (D) 24 days