Practice MCQ Questions and Answer on Time and Work
281.
A and B separately can build a wall in 12 and 16 days, respectively. If they work for each day alternatively, starting with A, in how many days will the wall be built?
- (A)
- (B)
- (C)
- (D)
282.
The labourers A, B, C were given a contract of Rs. 750 for doing a certain piece of work. All the three together can finish the work in 8 days, A and C together can do it 12 days, while A and B together can do it in
- (A) 4 : 5 : 6
- (B) 4 : 7 : 5
- (C) 5 : 7 : 4
- (D) 5 : 6 : 8
283.
If 72 men can build a wall of 280 m length in 21 days, how many men could take 18 days to build a similar type of wall of length 100 m ?
- (A) 30
- (B) 10
- (C) 18
- (D) 28
284.
A can complete work in 25 days and B can complete the same work in 20 days. They started the work together but B left after 4 days and A continued to work. In how many days will the entire work be completed?
- (A) 25
- (B) 20
- (C) 28
- (D) 22
285.
A completes
- (A)
- (B)
- (C)
- (D)
286.
A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together can finish it in 6 days. A and C together will do it in :
- (A) 4 days
- (B) 6 days
- (C) 8 days
- (D) 12 days
287.
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:
- (A) 4 days
- (B) 5 days
- (C) 6 days
- (D) 7 days
288.
Twenty women together can complete a piece of work in 16 days, 16 men together can complete the same work in 15 days. The ratio of the working capacity of a man to that of a women is = ?
- (A) 3 : 4
- (B) 4 : 3
- (C) 5 : 3
- (D) 4 : 5
289.
12 men can do a piece of work in 24 days. How many days are needed to complete the work, if 8 men do this work ?
- (A) 28 days
- (B) 36 days
- (C) 48 days
- (D) 52 days
290.
A and B working separately can do a piece of work in 9 and 15 days respectively. If they work for a day alternatively, with A beginning, then the work will be completed in ?
- (A) 10 days
- (B) 11 days
- (C) 9 days
- (D) 12 days