Practice MCQ Questions and Answer on Time and Work

331.

If 10 men or 20 boys can make 260 mats in 20 days, then how many mats will be made by 8 men and 4 boys in 20 days?

  • (A) 260
  • (B) 240
  • (C) 280
  • (D) 520

332.

A contractor decided to complete a work in 80 days and employed 60 men at the beginning and 20 men additionally after 20 days and got the work completed as per schedule. If he had not employed, the additional men, how many extra days would he have needed to complete the work (round off to the nearest integer)?

  • (A) 32 days
  • (B) 20 days
  • (C) 30 days
  • (D) 26 days

333.

A pipe can fill a tank in 0.9 hours and another pipe can empty in 0.7 hours. If tank is completely filled and both pipes are opened simultaneously then 450 liters of water is removed from the tank is 2.5 hours. What is the capacity of the tank?

  • (A) 200 liters
  • (B) 350 liters
  • (C) 456 liters
  • (D) 567 liters

334.

A can do a piece of work in 10 days, B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the whole work, the daily wages of B and C are ?

  • (A) Rs. 150
  • (B) Rs. 225
  • (C) Rs. 250
  • (D) Rs. 300

335.

Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is:

  • (A) 15
  • (B) 16
  • (C) 18
  • (D) 25

336.

Dinesh and Rakesh are working on an Assignment, Dinesh takes 6 hours to type 32 pages on a computer, while Rakesh takes 5 hours to type 40 pages. How much time will they take working together on two different computers to type an assignment of 110 page ?

  • (A) 7 hours, 30 minutes
  • (B) 8 hours
  • (C) 8 hours, 15 minutes
  • (D) 8 hours, 25 minutes

337.

40 men can complete a piece of work in 15 days. 20 more men joined them after 5 days they start doing work. How many days will be required by them to finish the remaining work ?

  • (A) $${\text{7}}\frac{2}{3}{\text{ days}}$$
  • (B) $${\text{6}}\frac{1}{5}{\text{ days}}$$
  • (C) $${\text{8}}\frac{1}{4}{\text{ days}}$$
  • (D) $${\text{6}}\frac{2}{3}{\text{ days}}$$

338.

A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in:

  • (A) 15 days
  • (B) 20 days
  • (C) 25 days
  • (D) 30 days

339.

Jyoti can do $$\frac{3}{4}$$ of a job in 12 days. Mala is twice as efficient as Jyoti. In how many days will Mala finish the job ?

  • (A) 6 days
  • (B) 8 days
  • (C) 12 days
  • (D) 16 days

340.

A and B together can do a piece of work in 30 days, B and C together can do it in 20 days, A starts the work and works on it for 5 days, B takes up and work for 15 days. Finally C finishes the work in 18 days. The number of days in which C alone can do the work where doing it separately is = ?

  • (A) 120 days
  • (B) 40 days
  • (C) 60 days
  • (D) 24 days